In this section

Related Links

Three-Day Reliability Region Demand Forecast

Download the ISO's hourly demand forecast for each day as forecasted in-day and the preceding two days, broken down by reliability region. The region's transmission system is divided into eight reliability regions that reflect the system's operating characteristics and major constraints. New England's load zones, which represent aggregations of pricing nodes within specific areas, generally correspond to these reliability regions.

 

Note: NEMASSBOST = Northeast Massachusetts and Boston Area Reliability Region; SEMASS = Southeast Massachusetts Reliability Region; WCMASS = Western/Central Massachusetts Reliability Region; % = the reliability region's demand as a percentage of the zonal total. The demand included in the forecast is in megawatts (MW).

Forecasts prior to May 24, 2017, can be found on the Three-Day Reliability Region Demand Forecast Archive.

 

 
Three-Day Reliability Region Demand Forecast
Description Timestamp Download
May 01, 2025 04/29/2025 09:14 AM EDT CSV
April 17, 2025 04/17/2025 09:43 AM EDT CSV
April 18, 2025 04/18/2025 09:34 AM EDT CSV
April 19, 2025 04/19/2025 02:30 PM EDT CSV
April 20, 2025 04/20/2025 10:57 AM EDT CSV
April 21, 2025 04/21/2025 03:34 PM EDT CSV
April 22, 2025 04/22/2025 09:26 AM EDT CSV
April 23, 2025 04/23/2025 09:14 AM EDT CSV
April 24, 2025 04/24/2025 09:28 AM EDT CSV
April 25, 2025 04/25/2025 11:51 AM EDT CSV
April 26, 2025 04/26/2025 09:22 AM EDT CSV
April 27, 2025 04/27/2025 10:31 AM EDT CSV
April 28, 2025 04/28/2025 09:12 AM EDT CSV
April 30, 2025 04/29/2025 09:14 AM EDT CSV
April 29, 2025 04/29/2025 09:14 AM EDT CSV