In this section

Related Links

Five-Minute Estimated Zonal Load

Download reports on the demand for electricity for each five-minute interval broken down by the eight load zones in New England. The report also displays demand that includes estimated Behind-the-Meter Solar. Behind-the-Meter Solar is defined as Settlement Only Generators and load reducers for which ISO New England does not monitor output in real-time. The values shown are instantaneous, not integrated values. They do not include reconstituted (added back) dispatched Demand Response Resources or the demand to run Electric Storage Facilities. The time listed in each row indicates the time that demand is sampled. Current data are made available in approximate real-time.


 
Five-Minute Estimated Zonal Load
Description Timestamp Download
Current - April 30, 2025 04/30/2025 02:10 AM EDT CSV
April 16, 2025 04/17/2025 05:00 AM EDT CSV
April 17, 2025 04/18/2025 05:00 AM EDT CSV
April 18, 2025 04/19/2025 05:00 AM EDT CSV
April 19, 2025 04/20/2025 05:00 AM EDT CSV
April 20, 2025 04/21/2025 05:00 AM EDT CSV
April 21, 2025 04/22/2025 05:00 AM EDT CSV
April 22, 2025 04/23/2025 05:00 AM EDT CSV
April 23, 2025 04/24/2025 05:00 AM EDT CSV
April 24, 2025 04/25/2025 05:00 AM EDT CSV
April 25, 2025 04/26/2025 05:00 AM EDT CSV
April 26, 2025 04/27/2025 05:00 AM EDT CSV
April 27, 2025 04/28/2025 05:00 AM EDT CSV
April 28, 2025 04/29/2025 05:00 AM EDT CSV
April 29, 2025 04/30/2025 12:05 AM EDT CSV